Residential Drywall Installation in Reile's Acres, ND | Clean Finish

Reile's Acres is a residential suburb on the edge of Fargo, home to about 870 people by the Census Bureau's 2024 estimate, with no commercial businesses inside city limits. Homes here house some of the largest families in the area, and in homes like these, the lower level often becomes full living space: family rooms, guest suites, bedrooms, home gyms, and media rooms. Fargo Elite Drywall installs and finishes drywall for homeowners across the city, with particular care for the basement details that decide whether a lower level feels finished.


A clean finish downstairs comes down to everything that interrupts a basement ceiling and walls: ducts, beams, posts, plumbing runs, and deep window openings. Boxed soffits need to run straight and level, steel beams and posts need crisp wraps, and window returns need sharp corners that catch light without showing a flaw. We plan those details as carefully as the open walls, so your lower level looks as polished as the main floor above it.

Request a FREE Quote.

Get the numbers you need to plan with confidence—no pressure, just clear and honest pricing.

Planned Carefully, Finished Cleanly

Fargo Elite Drywall is based in Fargo, just minutes from Reile's Acres, so planning visits and quick check-ins are easy to schedule. Before we quote a lower level, we map every duct, beam, and pipe with you and agree on how each will be boxed or wrapped, so there are no surprises once work starts. The stairway and main floor are protected throughout, dust is contained to the basement, and the work area is cleaned at the end of each day. You'll get a clear quote and a finished space you'll be glad to show off.

From Reinhold Reile's Farmstead to a Growing Suburb

Reile's Acres is named for Reinhold Reile, who owned the land and kept a farmstead on the site, which is why the name carries its apostrophe. By 1976 the development had 31 homes, and road maintenance had grown beyond what the Reed Township Board could handle. On February 22, 1977, the Cass County Commission incorporated it as a city with 147 residents. The first election took place that April in a resident's home, where 52 of the 82 eligible voters chose Jim Lutz as mayor.


Growth came slowly at first and then quickly. The population rose from 254 in 2000 to 513 in 2010, 703 in 2020, and an estimated 866 in 2024, while housing units more than tripled from 72 to 225 between 2000 and 2020. Today the city has three parks, including one with tennis courts, a ball diamond, and an ice skating rink, and its motto is "Building a Community Together." The 2023 survey data put the median household income at $198,333, and Zillow listed the average home price at about $578,400 in 2025.

Soffits, Beams and Posts Done Right

Every basement has obstacles overhead: main ducts, plumbing runs, steel or wood beams, and the support posts beneath them. Boxing those into soffits, sometimes called bulkheads, is where a lower level either looks planned or patched together. We check each soffit's framing with a laser so it runs level and straight, and we keep soffit heights consistent from room to room where possible. We also look for chances to make soffits part of the design, such as aligning one with a wall or using it to frame a seating area below.


Beams and posts need their own approach. A steel beam can be wrapped with furring and board or boxed into a soffit, with corner bead along every edge so the lines stay sharp. Support posts are wrapped square, often with a bit of trim at the base for durability. Basements also hide shutoff valves, cleanouts, and junction boxes that must stay reachable, so we plan drywall-trimmed access panels in the right spots instead of burying them behind a finished wall.

Large Households, Full-Size Lower Levels

Households here are among the largest of the communities we serve, averaging 3.47 people in the 2023 survey, and in 2010 about 61 percent had children at home. That puts real demand on space. In homes like these, the lower level often becomes a second main floor, with a family room, bedrooms for older kids or guests, a home gym, or a media room. Finishes downstairs need to match the quality upstairs, because these rooms get daily use, not occasional visits.


Basement windows deserve special attention. Foundation walls are thick, so window openings create deep returns that need to be wrapped on all sides, and egress windows in bedrooms often have the deepest returns of all. Each return gets straight corner bead or a clean J-trim edge against the window frame, and the inside corners are finished crisp, since daylight from that window will rake across those surfaces every afternoon. The stairway wall, often the tallest single wall in a lower-level finish, gets the same care because it's the first thing guests see on the way down.

How We Finish a Reile's Acres Lower Level

A lower-level finish has more obstacles than any other part of the house, so a clean result depends on planning each one. Here's how we take a basement from framing to finished, with the local details that shape each stage. The same care applies to main-floor projects, just with fewer soffits.

Step 1: Mapping the Lower Level

We start by walking the space with you and mapping everything that will affect the drywall: duct runs, plumbing lines, beams, posts, window openings, the stairway, and the mechanical room. A laser level across the ceiling shows how much the existing framing varies, which tells us how much shimming or furring the soffits will need. We also note every valve, cleanout, and junction box that has to stay accessible.


Housing units in the city more than tripled between 2000 and 2020, so most homes here are less than 25 years old, and newer homes are often built with lower levels left unfinished. By the time we arrive, those spaces are usually framed, so we check the framing for straightness and confirm that insulation and any required inspections are complete. You'll leave the visit with a clear soffit plan and an honest sense of what the space can become.

Step 2: Soffit Plan, Quote and Schedule

Your quote lays out each part of the lower level: open walls and ceilings, every soffit and beam wrap, post wraps, window returns, access panels, and the finish level for each room. If you'd like, we'll sketch the soffit layout so you can see how it ties the rooms together before any board goes up. If the project needs a permit or inspection through the City of Reile's Acres, we'll confirm it and plan around any inspection that has to happen first.


We'll also set a schedule that keeps the rest of the house running. Lower-level projects happen beneath busy main floors, so we plan the noisiest and dustiest work for times that suit your household and give you a heads-up before each stage. The city has no commercial businesses of its own, and most adults commute into Fargo-Moorhead, so daytime work often goes on while the house is quiet.

Step 3: Framing Checks and Protecting the House

Before hanging, we check soffit and wall framing with a laser and a straightedge, adding shims or furring wherever a run dips or bows. Soffit corners need to be square and their bottoms level, because a slight wave in the framing becomes a visible wave in a long, lit soffit. Beams and posts get furring where needed so the wraps come out square and true.


Then we protect the route. The stairway walls, railing, and treads are padded, the main-floor path from the door is covered, and the basement is sealed from the upstairs with plastic barriers and a zipper door. HVAC returns in the basement are covered while we sand. With home values here well above the Cass County median, the finished floors and trim upstairs deserve the same attention as the new work downstairs.

Step 4: Hanging Ceilings, Soffits, Wraps and Returns

Board goes up in an order that keeps every edge supported: open ceiling areas first, then the bottoms of soffits, then soffit sides, beam wraps, and post wraps, and finally the walls. Soffit sides are cut with straight factory edges along the bottom so their corners line up perfectly. On long runs, we stagger joints so seams don't line up across a soffit and the wall below it.


Window returns are cut and fitted piece by piece, with tight joints at each corner so the bead sits flat. Access panels are framed and set flush with the surrounding board. Where a post wrap meets the floor, we leave room for base trim so it can be finished cleanly later. Basement ceilings in the city's newer homes can be taller than in older houses, which means bigger soffits and longer runs to keep straight, and tight pieces at this stage keep the finishing work clean.

Step 5: Straight Lines and a Clean Finish

Soffit corners get bead installed along their full length and checked against a laser line instead of the ceiling, which may not be level itself. Long beads are joined end to end with tight, straight splices so the line never jogs. Post and beam wraps get bead on every edge, window returns are finished to sharp inside and outside corners, and flat seams are built up in thin coats and feathered wide.


Lower-level rooms used as main living space get the same finish level as the floor above, usually Level 4 under flat or eggshell paint, with skim coating offered for media walls or areas lit by wall-wash lighting. Each surface is checked with a work light held low along the soffits and returns, where light reveals the most. With so many households here raising kids, these rooms will see heavy daily use, so the finish has to look right in any light.

Step 6: Final Walkthrough, Access Check and Cleanup

When finishing is done, we clean the lower level thoroughly, take down the plastic once the dust settles, remove the protection from the stairway and main floor, and vacuum the route. Then we walk the space with you, sighting down soffits and checking every return, wrap, and corner.


We'll also open each access panel with you so you know where every valve, cleanout, and junction box can be reached. The lower level is left ready for paint, flooring, and trim. The city's motto is "Building a Community Together," and a well-finished lower level is one more place for a growing household to gather, whether that's for movie night, a home workout, or a sleepover after a day at the city park.

Get Your Drywall Project on the Calendar

Tell us about the rooms you want finished, repaired, or rebuilt, and we'll set up a time to see the space in person. You'll get a clear written quote covering materials, finish level, and cleanup, along with a schedule you can plan your week around. Fargo Elite Drywall serves homeowners in Fargo and the surrounding communities on both sides of the Red River.